Rehabilitation of Satsurblia Cave access road and adjacent infrastructure – Tskaltubo, Imereti

Published: March 1, 2019    /    Actual till: April 1, 2019

Georgia intends to receive financing from the World Bank toward the cost of the Regional Development Project II, and to apply part of proceeds for payments under the contract for: Rehabilitation of Satsurblia Cave access road and adjacent infrastructure.

 

The road to be rehabilitated is divided into two sections. The first section is 943 meters long and 4.0-5.5 meters wide. The road surface as well as cuvettes are damaged and need replacement. The second section of the road is 483 meters long. It’s a rocky ground road, which makes transport movement difficult for locals as well as tourists towards the cave. The private yards’ fences along the road are in a poor condition, covered with grass and bushes, in the need of rehabilitation. The SP includes replacement of the existing fences and rehabilitation of existing gates around plan plots along the road.

 

Detailed information is available on the following link of the state procurement unified electronic system: 

https://tenders.procurement.gov.ge/public/?go=297225&lang=ge