Rehabilitation of Roads, Foot Paths and Stormwater Drain System of Central Park and Lake "Tsivi" in Tskaltubo Town IDA/RDPII/CW/NCB/01-1-2014-L2
Published: March 13, 2014 / Actual till: April 4, 2014
The Georgia has received financing from the World Bank toward the cost of the Regional Development Project II, and intends to apply part of the proceeds toward payments under the contract for Rehabilitation of Roads, Foot Paths and Stormwater Drain System of Central Park and Lake "Tsivi" in Tskaltubo Town IDA/RDPII/CW/NCB/01-1-2014-L2
The Works consist of rehabilitation of the paths of Tskaltubo Town Park (18 076 m length), storm water drainage of “Tsivi Tba” (Cold Lake) perimeter (of 114 m length), storm water drainage of the central part of the Park (of 6 994 m length) and arranging of the bicycle and pedestrian paths (of 2 131 m length). The works include restoring of the path paving, repairs of the drainage and arranging of the bicycle path.