Donetski Street (Kutaisi Municipality) Rehabilitation
October 2, 2014
Sub-project is being implanted within the Second Regional and Municipal Infrastructure Development Project with WB support.
The PS includes rehabilitation of the Donetski street (The current name is Tavisupleba side street 6) in the city Kutaisi. Total length of the street to be rehabilitated within the sub-project is about 0,260 km. The SP includes rehabilitation of the sidewalks (208 m2) and the storm rainwater ditches with manholes and cover. Sidewalks is envisaged to be arranged for the entire length of road. Length of the storm-water pipes is 514 m.
Environmental Management Plan has been updated on March 2017 and is available at the following link: